Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B. design phase
C. implementation phase
D. maintenance phase
(2)A. main symptom
B. root problem
C. final blueprint
D. data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement
软题库参考答案:A、B、D、A、C(仅供参考)
软题库解析:正在加载....
你可能感兴趣的试题
Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the( )level.
A.independent resource
B.individual work load
C.work milestone
D.work package