Many of the activities performed during the preliminary investigation are still being conducted in(1 ), but in much greater depth than before. During this phase, the analyst must become  fully aware of the(2 ) and must develop enough knowledge about the(3 ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4 ) for process and data of current system, the deliverable from this phase also includes the(5 ) for the proposed system.
(1)A. analysis phase
B.  design phase
C.  implementation phase
D. maintenance phase
(2)A. main symptom
B.  root problem
C.  final blueprint
D.  data specification
(3)A. hardware environment
B. testing environment
C. software environment
D. business environment
(4)A. logical models
B. physical models
C. design models
D. implementation models
(5)A. hardware and software specification
B. system performance specification
C. formal requirements definition
D. general problem statement

查看答案

软题库参考答案:A、B、D、A、C(仅供参考)

软题库解析:正在加载....

你可能感兴趣的试题

75题:

Creating WBS means subdividing the major project deliverables into smaller components until the deliverables are defined to the(  )level.
A.independent resource
B.individual work load
C.work milestone
D.work package

8题:

项目质量保证不以下列为特性:
A.评价整
完整内容请通过题库练习系统作答
28题:5G采用了( )技术来支持三大应用场景。
A. 大规模天线技术和LDPC编码方案
B. MIMO技术和短帧技术
C. Polar编码方案和快速反馈技术
D. 三种应用场景无需技术支持
27题:

你来建设污水处理厂, 日常规测试显示水中有污染物
完整内容请通过题库练习系统作答
64题:不属于区块链典型特征的是()。
A.多中心化
B.时序数据
C.安全可信
D.可篡改
12题:

需要很多谈判技巧的三种项目情形是:

完整内容请通过题库练习系统作答