() involves  choosing part of a population of interest for inspection
A、 Check list
B、 Check sheet
C、Statistical sampling
D、Questionnaire
查看答案

软题库参考答案:C(仅供参考)

软题库解析:正在加载....

你可能感兴趣的试题

67题:

During the project, requirements change for a variety of reasons. As needs change and as work proceeds, additional requirements are derived and changes may have to be made to the existing  requirements. It is essential to manage these additions and changes efficiently and effectively. To effectively analyze the impact of the changes, it is necessary that the source of each requirement is known and the rationale for any change is documented. The project manager may,  however, want&n57题:

李先生是某软件开发公司负责某项目的项目经理,该项目已经完成了前期的工作进入实现阶段,但用户提出要增加一项新的功能,李先生应该(  )。
A、拒绝该变更
B、认为用户要求合理,立即实现该变更
C、通过变更控制过程管理该变更
D、要求用户与公司领导协商

43题:某承建单位准备把机房项目中的系统工程分包出去,并准备了详细的
完整内容请通过题库练习系统作答
187题:项目经理正在参考图表,并问高级技术人员过程是否在控制范围内。
完整内容请通过题库练习系统作答
30题:从装配线出来的一系列产品最近出现误差,项目经理需要知道这些误差是否在可接受的范围内。项目经理需要使用哪些工具?
A.直方图
B.帕累托图
C.石川图
D.控制图